- Molding around the new floor tile and the wall tile.
- Caulk the tile, tub and toilet.
- Install the vanity - cutting access holes for pipe.
- Establish the layout of sink.
- Install the sink and faucet.
- Install a floating shelf between the vanity and mirror.
- Put up the shower curtain.
- Decorate with tray and knick-knacks.
No comments:
Post a Comment