Need to adjust the ends of the bed and install the slats. Then some fine sanding and paint.
These are the projects we've been working in our home. Sweat equity at its best and worst.
Tuesday, October 26, 2010
Pedestal Project Day 3
Second coat of paint and the hardware installed. Moved it into the laundry and all set for delivery.
Monday, October 25, 2010
Pedestal Project Day 2
Today, I finished the second pedestal. It went fairly quick, since most of the wood was cut. I was short some of the short braces. I also picked some trim for the faux drawers.
So after assembling, sanding and putting on the side panels they were ready for a first coat of paint.
And from the front with the bottom exposed. You can see how solid these puppies are.
Luckily, we found some left over eggshell white paint. So that's what they color they will be. Tomorrow is a final top coat of paint and they should be ready for the delivery of the washer and dryer on Tuesday.
So after assembling, sanding and putting on the side panels they were ready for a first coat of paint.
And from the front with the bottom exposed. You can see how solid these puppies are.
Luckily, we found some left over eggshell white paint. So that's what they color they will be. Tomorrow is a final top coat of paint and they should be ready for the delivery of the washer and dryer on Tuesday.
Subscribe to:
Posts (Atom)