Molding around the new floor tile and the wall tile.Caulk the tile, tub and toilet.Check the vanity top to make sure it's smooth.Install the vanity - cutting access holes for pipe.Establish the layout of sink.Install the sink and faucet.- Install new hardware on doors and install them back on the vanity.
- Find some shelves and install in place of medicine cabinet.
- Put up the shower curtain.
- Decorate with tray and knick-knacks we picked up on clearance at Pier 1.
- Re-hang the door
These are the projects we've been working in our home. Sweat equity at its best and worst.
Monday, August 30, 2010
Punch List for BRFH 2010
Things left to do: